Earthwork Excavation Bank, Loose Swell & Compacted Cubic Yards Calculator

Convert Bank Cubic Yards (BCY) into swelled truck haul-off volume (LCY) and CCY.

Excavated Loose Volume (LCY)
150 LCY
Dump Truck Haul Loads Needed 11 loads
Compacted Fill Volume (CCY) 105.6 CCY
Bank-to-Compacted Borrow Needed 136.36 BCY
Inputs
BCY
In-situ undisturbed excavation volume in Bank Cubic Yards (BCY).
%
Excavation bulking / swell percentage (15% sand, 25% common earth, 35% clay).
%
Compaction shrinkage percentage relative to bank volume (%).
LCY/truck
Haul truck bed loose capacity in cubic yards.
Results & Graph
Excavated Loose Volume (LCY)
150 LCY
Dump Truck Haul Loads Needed
11 loads
Compacted Fill Volume (CCY)
105.6 CCY
Bank-to-Compacted Borrow Needed
136.36 BCY

Excavated Loose Volume (LCY)

Graph 1 • Bank Volume Cu Yd Sensitivity Recalculates the domain equation across 50% to 150% of the primary input while holding other parameters constant.
0 LCY 121.5 LCY 243.0 LCY 50%: 75 LCY 75 50% 75%: 112.5 LCY 112.5 75% 100%: 150 LCY 150 100% 125%: 187.5 LCY 187.5 125% 150%: 225 LCY 225 150%
Graph 2 • Primary & Supporting Metric Comparison Compares the primary output alongside supporting domain benchmarks.
Excavated Loose Volume (LCY) 150 LCY Dump Truck Haul Loads Needed 11 loads Compacted Fill Volume (CCY) 105.6 CCY Bank-to-Compacted Borrow Needed 136.36 BCY
Graph 3 • Exact Output Table & Units Displays each calculated output in its exact domain unit.
Excavated Loose Volume (LCY)150 LCYDump Truck Haul Loads Needed11 loadsCompacted Fill Volume (CCY)105.6 CCYBank-to-Compacted Borrow Needed136.36 BCY
Summary: 120 Bank Cubic Yards swells by 25% to 150 Loose Cubic Yards (11 dump truck loads) and compacts to 105.6 Compacted Cubic Yards.
Summary: 120 Bank Cubic Yards swells by 25% to 150 Loose Cubic Yards (11 dump truck loads) and compacts to 105.6 Compacted Cubic Yards.
Interactive chart & math engine powered by CalculatorGraph

Formula & Mathematical Methodology: Soil Swell & Shrinkage Formula

LooseCuYd (LCY) = BankCuYd × (1 + Swell%)
CompactedCuYd (CCY) = BankCuYd × (1 − Shrinkage%)
LooseCuYd (LCY) = BankCuYd × (1 + Swell%); CompactedCuYd (CCY) = BankCuYd × (1 − Shrinkage%)
  • bankVolumeCuYd: Bank Volume Cu Yd (BCY)
  • soilSwellFactorPct: Soil Swell Factor Pct (%)
  • compactionShrinkagePct: Compaction Shrinkage Pct (%)
  • dumpTruckCapacityCuYd: Dump Truck Capacity Cu Yd (LCY/truck)

Rounding: Physical package counts round up where appropriate; continuous measurements round to 2 decimal places.

Worked Example: Practical Benchmark: Soil Swell & Shrinkage

Convert Bank Cubic Yards (BCY) into swelled truck haul-off volume (LCY) and CCY.

  1. Enter your project dimensions, machining speeds, or recipe weights.
  2. Compute the governing equation: LooseCuYd (LCY) = BankCuYd × (1 + Swell%); CompactedCuYd (CCY) = BankCuYd × (1 − Shrinkage%).
  3. Review the primary result, supporting dimensions, and 3 SVG visualizations.
Result: Computes Soil Swell & Shrinkage via LooseCuYd (LCY) = BankCuYd × (1 + Swell%); CompactedCuYd (CCY) = BankCuYd × (1 − Shrinkage%).

Frequently Asked Questions

How does the Earthwork Excavation Bank, Loose Swell & Compacted Cubic Yards Calculator calculate results?

It evaluates LooseCuYd (LCY) = BankCuYd × (1 + Swell%); CompactedCuYd (CCY) = BankCuYd × (1 − Shrinkage%) directly in your browser and plots three custom SVG visualizations.

Can I compare different material dimensions or batch sizes side by side?

Yes. Click "Compare (0/3)" in the results toolbar to pin up to 3 scenarios side by side.

Can I print a clean shop or kitchen reference sheet?

Yes. Click the Print button in the results toolbar for a distraction-free worksheet.

Construction & Home · Sitework & Paving

Earthwork Excavation Bank, Loose Swell & Compacted Cubic Yards Calculator: inputs, method, and how to read the result

Convert Bank Cubic Yards (BCY) into swelled truck haul-off volume (LCY) and CCY.

Choose inputs for the case you are checking

The defaults are illustrative. Replace them with values for your case and keep the units shown beside each field.

  • Bank Volume Cu Yd: In-situ undisturbed excavation volume in Bank Cubic Yards (BCY).
  • Soil Swell Factor Pct: Excavation bulking / swell percentage (15% sand, 25% common earth, 35% clay).
  • Compaction Shrinkage Pct: Compaction shrinkage percentage relative to bank volume (%).
  • Dump Truck Capacity Cu Yd: Haul truck bed loose capacity in cubic yards.

What the calculation includes

With the default values shown, Excavated Loose Volume (LCY) is 150 LCY. The calculation follows Soil Swell & Shrinkage Formula; the formula and variable definitions above show how the inputs combine.

One-input check: With the other defaults held constant, changing Bank Volume Cu Yd from 120 BCY to 132 BCY changes Excavated Loose Volume (LCY) from 150 LCY to 165 LCY. This is a comparison inside the calculator's stated model, not a prediction.

Where to use caution

  • Uses standard North American & metric trade dimensions, Machinery’s Handbook formulas, and culinary weight ratios.
  • Verify local municipal building codes, tool manufacturer limits, and food-safety time/temperature tables before execution.

Scope: Trade, Shop & Culinary Science Reference Standard Check the assumptions and limitations against your situation before relying on the estimate.

More in Construction & Home: Board Foot, Lumber Weight, Wall Stud Framing & Board-and-Batten Calculator, Concrete & Square Footage Calculator, Cooking Conversions & Recipe Scaling Calculator.