Steam Boiler Blowdown Rate (TDS Balance) & Flash Steam Recovery Calculator: inputs, method, and how to read the result
Compute boiler TDS blowdown rate (lb/hr) and flash steam energy recovery.
Choose inputs for the case you are checking
The defaults are illustrative. Replace them with values for your case and keep the units shown beside each field.
- Steam Generation Rate Lb Hr: Boiler steam generation rate in lb/hr.
- Feedwater Tds Ppm: Boiler feedwater / make-up Total Dissolved Solids (ppm).
- Max Allowable Boiler Tds Ppm: Maximum allowable boiler drum TDS concentration (ppm).
What the calculation includes
With the default values shown, Required Continuous Blowdown Flow is 957.45 lb/hr. The calculation follows Boiler Blowdown & Flash Steam Formula; the formula and variable definitions above show how the inputs combine.
One-input check: With the other defaults held constant, changing Steam Generation Rate Lb Hr from 15,000 lb/hr to 16,500 lb/hr changes Required Continuous Blowdown Flow from 957.45 lb/hr to 1,053.19 lb/hr. This is a comparison inside the calculator's stated model, not a prediction.
Where to use caution
- Uses standard NREL, IEEE, ASHRAE, and IRC design equations.
- Verify final structural, electrical, and mechanical specifications against local building codes.
Scope: Global Engineering & Building Code Standard Check the assumptions and limitations against your situation before relying on the estimate.